News Flash

Home

Posted on: April 18, 2019

Bridge File 80155 - BRID Drop 5 Project

DJI_0027

The M.D. of Taber, Bow River Irrigation District, and Alberta Transportation have been and continue to work collaboratively to replace an important piece of infrastructure. 

The Bridge File 80155 / BRID Drop 5 project combines a local road bridge with an irrigation drop structure resulting in considerable cost savings to each party.

 This roadway will be opened to the public for travel on Thursday April 18, 2019.

DJI_0027


DJI_0015

Facebook Twitter Email

Other News in Home

PGP Water Supply Project GRAND OPENING - Package_Page_1

Grand Opening - Prairie Gold

Posted on: May 16, 2019
MD Logo - no background

MD of Taber - Surplus Equipment

Posted on: May 15, 2019
MD Logo - no background

MD of Taber Recreation Survey

Posted on: May 21, 2019
MD Logo - no background

2019 AGM Posters

Posted on: May 2, 2019
IMG_8278

Road Safety - Construction Season

Posted on: April 18, 2019
MD Logo - no background

MD of Taber Annual Local Road Cleanup

Posted on: April 15, 2019
MD Logo - no background

Road Bans - Updated

Posted on: April 4, 2019
hwy 3 - fb 1

Highway 3 Connector

Posted on: April 1, 2019