News Flash

Home

Posted on: September 4, 2019

Bridge Construction - HWY 36 - South of Taber

Road Construction

Alberta Transportation is scheduled to begin bridge construction over the SMRID main canal along Highway 36 on September 9, 2019 through October 11, 2019. This location is approximately 6 kilometers south of the Town of Taber. Traffic will be reduced to one lane alternating traffic controlled by temporary traffic signals and a reduced speed limit. The travelling public can expect delays of up to 30 minutes.

Facebook Twitter Email